All Information
India
Nationality
**********gmail.com
E-Mail id
******* 52232
Phone No.
01-Jan-1995
Date of birth
USD $1500/ Per Month
Current Salary
8 Year(s)
Experience
Production
Industry
Other
Sub Industry
Roles and Responsibilities
Over 8+ years of working experience in drilling and workover operation to execute on site. Proven track record in optimizing drilling and workover operations, controlling high-pressure situations, and saving costs. Adept at collaborating with multidisciplinary teams to deliver results with a strong focus on safety and efficiency. Supervise the execution of well completion and work over operations including troubleshooting on the activities and ensure the required resources are available for well operations activities. Execution of operations as per well plan, technical supervision, logistic management and Reporting. Supervising the execution of well completion operations with Artificial Lift System PCP, ESP and SRP (Progressive Cavity Pumps, Electrical Submersible Pump, Sucker Rod Pumps). Experienced in fishing operation in open and cased hole using - Fishing Jar, overshot, bumper sub, fishing spear, die-collar, taper tap, fishing magnet etc Preparation of Daily Progress Report in IADC format, Kill sheets, trip sheets, hydraulics Calculations. Supervise all rig operations as specified by the requirements of WORK Programme during operation. Well control, sand cleaning, flushing job, Milling job, setting mechanical & hydraulic set packer, casing scrapper job, sand bailer operation etc Designing and managing operation to optimize efficiency and ensure compliance with safety and environmental standards Designing and managing drilling programs to optimize efficiency and ensure compliance with safety and environmental standards . Coordinating with the subsurface group to understand the subsurface requirements and drilling hazards before initiating the well design process. Reviewing the basis of well design and the supporting simulations (casing design, hydraulics, T&D, etc.). Preparation of drilling program / montage as per the geological prognosis issued by the subsurface team. Responsible for preparing detail engineering analysis required for design a well in optimal cost. Supervised well design and operations for wells. Conducted real-time monitoring and optimization to achieve cost-effective drilling outcomes. Supervise critical operation including but not limited to trips, running casing & liner, cementing, nipple up & nipple down BOP stack, Wellhead installation and testing, BOP testing, stuck pipe, downhole fluid loss etc. Ensure that all mechanical and electrical maintenance jobs are carried out as per PM Schedule. Maintain inventory of well consumables and raise purchase request (PR) as and when required. Carry out rig down, rig move and rig up operation along with drilling crew in safe and efficient manner adhering to company’s SOP. Perform the daily checklist, i.e. QHSE checks, mast inspection, choke and kill manifold set up, etc. Execute rig operations as specified by the requirements of WORK Programme during operation.
Additional Skills/Certification
IADC level 4 , well control, first aid , fire fighting
Career Summary (Experience information)
| Position | Employer | Country | From | To | Mode |
|---|---|---|---|---|---|
| Tool pusher and Night toolpusher and driller and assistant driller | REPL | India | 01/2014 | 02/2025 | Full Time |
Education Summary
| Course | University | Passing Year | Country |
|---|---|---|---|
| engineering and diploma in drilling technology | ISBM UNIVERSITY AND GOVERNMENT POLYTECHNIC INSTITUTE | 2013 | India |
Primary Languages
Lg
English
Basic
Secondary Languages
Lg
Hindi
Basic