All Information
Uganda
Nationality
**********gmail.com
E-Mail id
******* 13950
Phone No.
16-Nov-1986
Date of birth
USD $100/ Per Day
Current Salary
10 Year(s)
Experience
Drilling / Rig
Industry
Sub Industry
Roles and Responsibilities
Maintenance on mud pumps,Help the driller during RIH and POOH by racking back pipes on the Derrick, Control Mud Tanks and also helps in other Rig operations during Rig up and Rig down, helps in coordinating the Roustabout, helps in mixing chemicals during drilling operations, he is responsible for well control duties by mixing and lining up kill mud Incase of well control situation,the Derrick Man is also responsible for maintaining the crown block and traveling block through greasing, it is the duty of a Derrick Man to check and monitor the Mud volume inside the tanks, he checks the mud weight both in and out and reports to the Mud engineer, Incase of any anomaly the Derrick Man reports directly to the driller, the Derrick Man helps in coordinating other activities of the Rig like cleaning, greasing the mixing pumps, All other related work at heights activities are for the Derrick Man like during slip and cut it is the duty of a Derrick Man to secure the traveling block
Additional Skills/Certification
Welcontrol certification, confined space training certificate, work at heights, first aid training certificate, Lock out and tag out certificate
Career Summary (Experience information)
| Position | Employer | Country | From | To | Mode |
|---|---|---|---|---|---|
| Derrick Man | Total Energy ZPEB Rig 1501 | Uganda | 01/2021 | 07/2025 | Full Time |
Education Summary
| Course | University | Passing Year | Country |
|---|---|---|---|
| A level certificate | Employed | 2005 | Uganda |
Primary Languages
Lg
English
Basic
Secondary Languages
Lg
English
Basic