Javascript not enabled
SVG
SVG
SVG
SVG
Featured

Jorge Johan Garcia Diaz

Developer Venezuela $8500/Per Month 16-Jan-1978
All Information
Venezuela

Nationality

**********gmail.com

E-Mail id

******* 95655

Phone No.

16-Jan-1978

Date of birth

USD $8500/ Per Month

Current Salary

23 Year(s)

Experience

Drilling / Rig

Industry

Rig Electrician

Sub Industry

Roles and Responsibilities

Drilling Rig Foreman: Accountabilities: Serve as the primary liaison between client and client contractors and shall provide supervision of all operations performed on client wells /Ensure that client contractors meet all contract requirements and shall verify and approve all client contractor and service company operations by way of tour reports and field ticket /Provide engineering methods and procedures for wells drilling and workover /Recommend best operational practices that are under of corporation policies /Carry out with client recommendations on stuck pipe incidents, accustom courses contents to D&WO operations. /Keeping updates the forecast, schedule and planned activities during the well construction to anticipate resource needs, meet well demands, and ensure optimal service efficiency as well as minimize the NPT. /Analysis of the daily operation report /Analysing drilling data for efficiency improvements /Member of the team of tender and contracts of well services and drilling rigs. /Provide strong leadership in all areas of health, safety, and environmental (HSE) protection, ensuring the use of safe working practices according with the normative and local law. /Responsible on services provided and materials used /Ensure the rig maintenance in its different types /Ensure the maintenance and repair activities and monitoring rig operational costs to enhance the overall efficiency within budgetary constraints. Leader of the HPHT Projects in the Santa Barbara Field with Drilling Rig of 3000 hp Capacity and wells with gradients 0.85 psi/ft. The completion was made with 1100 hp Workover Rigs. Leader in gas wells drilling in San Joaquin and Santa Rosa Fields, wells high pressure with drilling rig from 1500 hp to 2000 hp and average production 4 million cubic feet a day for wells. Average depth 12 thousand feet. Last wells drilled: RG-242, RG-47 and RG-251 also JM-275. Achievements: It was reached the annual project portfolio in 80% of the planned wells, decreased in 15% Non-Productive Time with respect last year. It's achieve drill the HPHT well more deep in the area with the drilling rig HP-116 (3000 hp) to a Deep 23980 ft. well type (J). Coordinate with success the SIMOPS operations projects.

Additional Skills/Certification

Leadership. Strategic planning. Critical thinking. Problem solving. Orientation to results. Investigation Initiative Teamwork

Career Summary (Experience information)
Position Employer Country From To Mode
Drilling and Workover Engineer / Drilling Rig Foreman / Drilling Supervisor Pdvsa Gas Venezuela 02/2002 02/2010 Full Time
Rig Engineer / Rig Inspector Pdvsa - CNPC China 02/2012 02/2013 Full Time
Senior Drilling and Workover Engineer / Drilling Rig Foreman/Liaisonman Pdvsa - YPFB Bolivia 02/2010 03/2014 Full Time
Drilling Operations Manager Pdvsa Gas Venezuela 03/2014 02/2016 Full Time
Drilling and Maintenance Rigs Superintendent Pdvsa Gas Venezuela 02/2016 06/2017 Full Time
Drilling Rig Performance Manager Pdvsa Gas Venezuela 06/2017 10/2018 Full Time
Drilling Rig Foreman/Liaisonman Pdvsa Gas Venezuela 10/2018 09/2020 Full Time
Drilling and Workover Spacialist Imetame Energia Brazil 12/2020 05/2022 Full Time
Drilling and Workover Spacialist Maha Energy Brazil 05/2022 06/2023 Full Time
Drilling and Workover Spacialist 3RP Brazil 06/2023 12/2024 Full Time
Education Summary
Course University Passing Year Country
Industrial Engineering Santiago Marino University 2001 Brazil
Primary Languages
Lg
Spanish

Basic

Secondary Languages
Lg
English

Basic

Find The Perfect Job
on Falcon Job That is Superb For You