All Information
Roles and Responsibilities
Preparation of ESP equipments at Base wouri. • Reassembly and disassembly of equipement ESP des puits défaillant. • Installation of new ESP well. • Visual and mechanical inspection of downhole equipment (Moteur, Seal, Aspirateur, Pompe…) at the base,then on site before the start du work over. • Electrical inspection (continuity and insulation measurement) cable ESP et Motor • Installation des CCP (Cross Coupling) with the cable ESP • Ensure the good functionning of the spooler at the base and on sites • Electrical inspection and sensor pressure test • Prepare the consumables list and review the consumables necessary before sending them on sites. • Checking the different type of lifting field for dismanting and installation of equipment ESP • Connect and disconnect BIW penetrators on ESP wells
Additional Skills/Certification
Training in preventive maintenance mechanics, training in slinging ,BNW training
Career Summary (Experience information)
| Position | Employer | Country | From | To | Mode |
|---|---|---|---|---|---|
| July 2011 | Perenco | Cameroon | 04/2015 | NaN/NaN | Full Time |
Education Summary
| Course | University | Passing Year | Country |
|---|---|---|---|
| Université Baccalaureate | First year of university | 2015 | Cameroon |
Primary Languages
Lg
English
Basic
Secondary Languages
Lg
French
Basic