All Information
Roles and Responsibilities
Checking of all the Equipment’s or Facilities as per P&ID[proper rating gaskets,flanges,bolts/studs,supports,pr.Gauge,Temp.gauge,floworifice,vent,drain,Psv,Rov & other ancilliaries in the system] Carried out Auditing by the respective Dept’s. competitive personnel Prepare Punch list & get execution from the contractor. Get the proper work permits for start up Ensure hydro testing, flushing, cleaning, blowing& nitrogen purging of the system Check all the bolts for suction, discharge, vent drain, foundation & check for any leaks. Carryout the priming. Start the Equipment’s in the presence of Operation personnel Check for leaks, Suct. Pr., Disch.Pr., delta-P, Flow. Check for Temp., Pr., Vibration of the piping’s & Equipment’s as well. Check for correct rotation of the Motor, function of PSV, all gauges. Check for hot alignment after few running hours. Performed dynamical test of various rotating Equipment’s. Monitoring and prepare list of abnormalities of the specific equipment’s in order to avoid unexpected, undue breakdown of the equipment’s
Additional Skills/Certification
Basic H2S Training BA Training HSE Induction PTW Recieved Training Confined Space Entry Work at Heights Fire Prevention and Fire Fighting Training
Career Summary (Experience information)
| Position | Employer | Country | From | To | Mode |
|---|---|---|---|---|---|
| Mechanical Technician | WESCO ABU DHABI LLC | United Arab Emirates | 10/2024 | 03/2025 | Full Time |
| Mechanical Technician | MUBARAZ OIL FIELD INSTALLATION LLC | United Arab Emirates | 04/2025 | 05/2025 | Full Time |
Education Summary
| Course | University | Passing Year | Country |
|---|---|---|---|
| Diploma in Mech. Engineering | T.E.B. | 2005 | India |
Primary Languages
Lg
English
Basic
Secondary Languages
Lg
English
Basic