All Information
Roles and Responsibilities
Operational Management: Oversight of full-cycle drilling, completion, and well intervention operations for deep HPHT gas wells (+4500m to 6500m). Currently managing a supervision budget of $4.2M and coordinating 9 rigs simultaneously (ZJ 50, ZJ-70 and ZJ-90 DBS units). Engineering & Design: Planned and implemented 300+ BHA configurations, achieving a failure rate of less than 0.5%. Conducted comprehensive casing and tubing stress analysis and hydraulic modeling using Halliburton Landmark software (WellPlan, WellCat, StressCheck) to ensure string integrity in high-pressure environments (+81 MPa). Directional Drilling: Managed 35+ complex sidetracking operations, including window milling and whipstock orientation. Drilled ERD with no LTI (Whipstock at 1600m>Window milling> 4 ½’ open hole over 2250m with Mud Motor, INC 61˚, SPP > 260 bars) - with Mud Motor) and 3D profiles using APS, NOV Tolteq Relief Wells: Directed the drilling of 2 relief wells (+2500m TVD) to kill a surface gas blowout with H2S > 20 ppm on the M25 project, Uzbekistan Optimization & Cost Control: Increased ROP by 60% in hard rock formations through custom parameter optimization. Successfully rescued stuck pipe incidents without jars, saving approximately $400K in operational costs. Project Leadership: Leading a multidisciplinary team of up to 120 personnel, ensuring strict adherence to technical specifications and minimizing Non-Productive Time (NPT) across multiple project sites in Uzbekistan and Russia.
Additional Skills/Certification
Software: Halliburton Landmark (Compass, WellPlan, StressCheck, WellCat), Peloton Suite, BurSoft Project Tech: ERD, Sidetracking, Window Milling, Relief WellsL/MWD (APS, NOV). Certifications: IADC WellSharp (Supervisor Level), H2S Awareness, First Aid Training, RigPass, Workover & Completion operations, Supervising management training program Specs: HPHT (+81 MPa / 196°C), ZJ 70/90 DBS rigs, Long-lead procurement, 35+ sidetracking operations
Career Summary (Experience information)
| Position | Employer | Country | From | To | Mode |
|---|---|---|---|---|---|
| Assistant Driller, Derrickman, Mud Lab Tech, Rig Mechanic trainee | Uzbekneftegaz JSC | Uzbekistan | 04/2012 | 04/2016 | Full Time |
| Sr DD Engineer | Drilling Engineer | Uzbekneftegaz JSC | Uzbekistan | 04/2016 | 01/2020 | Full Time |
| Sr DD Engineer | DD Engineer | ERIELL Group | Uzbekistan | 04/2020 | 11/2022 | Full Time |
| Deep Wells Projects & DD Projects Coordinator | ERIELL Group | Uzbekistan | 11/2022 | 06/2025 | Full Time |
| Head of Drilling & Completion & Well Intervention Supervision | JV LLC Techenergy (GazpromNeft) | Uzbekistan | 04/2025 | 04/2026 | Full Time |
Education Summary
| Course | University | Passing Year | Country |
|---|---|---|---|
| : B.Sc. in Oil & Gas Engineering (Drilling) | Gubkin State Oil&Gas University | 2019 | Russia |
Primary Languages
Lg
English
Basic