Photo

  PRASHANT PAL

  Current Location: India

  •  Manager
  • Profile Created Date:29 Mar 2020

Description

  • A result oriented professional with 7.6 years of rich experience in:-

Plant Operations & Management                  Project Management

Process Enhancement                                       Refinery Operations

Commissioning & Pre – Commissioning     Liaising & Coordination

Petrochemical & Gas Processing Facilities                Team Management

  • In-depth knowledge of commissioning & operations of various process equipment’s& units like centrifugal & reciprocating pumps & compressors, distillation columns, multi - phase separators, and heaters / furnace, HRSG, CGC, PRC, etc. 
  • Last worked with GS Engineering, UZ - KOR Ethelyen Plant Project, Uzbekistan as Commissioning Engineer.
  • Well versed with permit systems to carry on work in hazardous area in compliance with all the safety standards followed in oil & gas plants.
  • Proven abilities to enhance process, with capacity utilisation and escalating productivity & operational efficiencies; while curtailing costs & expenses across organisations.
  • A project planner with skill in planning, executing and spearheading projects.
  • Resourceful at strategizing techniques for maximum utilisation of manpower / machinery. Qualified with B.Tech. (Chemical Engineering).
  • Exceptional track record that demonstrates self - motivation, creativity, and initiative to achieve business goals. Believe in leading from the front.
  • Devising and ensuring implementation of company’s strategies of the company.
  • Developing pre-commissioning and commissioning interfaces matrix with other projects and differentiate between different packages within same development project.
  • Experience in
  • Working as Production Engineer on PLC system in MTPD of gasoline production in NTGG plant.
  • P & ID review, HAZOP study and model review.
  • Pre-commissioning activities check listing, flushing / drying, nitrogen purging, leak test, system mark - up, innertization / passivation, etc.
  • Preparing OTP (Operating Test Procedures) for pumps, lube oil flushing, etc.
  • Coordinating with licensor, client, PMC, vendors, contractors, commissioning and start - up team.
  • Building credibility, establishing rapport and maintaining communication with stakeholders at multiple levels, including those external to the organisation.

DESIGNATION:  Commissioning Engineer

LOCATION       : GS Engineering, UZ - KOR Ethelyen Plant Project, Uzbekistan

DURATION       : Aug 2015-Oct 2015

 

Accountabilities

  • Oversaw commissioning start - up of UZ - KOR ethelyen plant.
  • Commissioned CGC (Craked Gas Compressor) & caustic wash unit & complete the 72 hours PGTR with safety.

DESIGNATION:  Process Engineer

LOCATION       : OML - 58 Project, Total Nigeria, (Saipem, Nigeria)

DURATION       : Aug’14-Apr’15

 

Accountabilities

  • Supervised commissioning of flow station (Obagi Cluster), a project for commissioning of compressor MP, HP, LP, LLP compressor & pumps, multi stage separator’s, crude storage and ISBL & OSBL commissioning.
  • Lead and organised vendor support required for equipment packages and other utility packaged skids on all systems, and have a well-rounded knowledge of major equipment packages.
  • Tracked progress of pre - commissioning activities and an ability to coordinate with other discipline leads to ensure completions targets and schedules.
  • Generated progress reports from completions management system. Interfaced with EPC and clients operations.
  • Assigned sub - systems to competent mechanical / piping supervisors and to perform quality assurance checks to verify that all systems are in place for pre – commissioning & commissioning.
  • Prepared operating manuals in cooperation with the process department, process licensors and vendors.

DESIGNATION: Process Engineer

LOCATION       : MGP Project, Oman, (Hyundai Engineering Co. Ltd. under contract of     CEGLEC, Abu Dhabi)

DURATION       : Apr’14-Jul’14

 

Accountabilities

  • Commissioned LPG treating unit, SRU, ARE, AGE, TGTU, INLET Gas Compressor System & Crude Storage.
  • Commissioned all utilities like cooling water, RO water, DM water, STEAM HP, LP, MP and FLARE.
  • Reviewed final issue of PID’s from point of view of commissioning and start - up, issuing of PID’s modification according with project standards and regulations.
  • Identified systems and sub - systems by marking up of PFD’s and PID’s – system definition.
  • Assisted construction departments by defining priority systems with overall construction and pre - commissioning & commissioning planning and schedule. Participated in constructability analysing order to meet project schedule.
  • Prepared pre - commissioning, commissioning and start - up execution plans.
  • Developed planning and scheduling of pre - commissioning and commissioning plan for entire projects and integration with client planning for commissioning and start - up.

DESIGNATION:  Commissioning Supervisor

LOCATION         : Ruwais Refinery Expansion (SK Engineering & Construction Ltd.) Abu-Dhabi

DURATION       : Dec’12-Mar’14

 

Accountabilities

  • Commissioned SGP (Saturated Gas Plant) CDU (Crude Distillation Unit).
  • Developed detailed pre – commissioning / commissioning procedures based on P & ID’s.

Nationality : India


Residential country : india


Date of birth : 20-04-1985

Address : 28 / 110, Hanuman Colony, Guna (M.P.), PIN Code – 473001


Language:


Language Known

Skills

    B.Tech. (Chemical Engineering) from ITM (Institute, Technology and Management), Gwalior in 2008 year.

    Conversant with MS – Office Applications (Word & Excel

    • GATE 2011 qualified, AIR 2005.
    • Honoured with Received safety award & certificate for safe working & spreading general awareness of safety on site in ONGC HAZIRA by L & T.
    • Undergone Basic Offshore Safety Induction & Emergency Training in 2015

Education

2008

B E / B Tech from ITM (Institute, Technology and Management), University

India

Career

08/2015 - 10/2015

Position: Commissioning Engineer

Employer: GS Engineering, UZ - KOR Ethelyen Plant Project

Country: Uzbekistan

08/2014 - 04/2015

Position: Process Engineer

Employer: OML - 58 Project, Total Nigeria

Country: Nigeria

04/2014 - 07/2014

Position: Process Engineer

Employer: MGP Project, Oman, (Hyundai Engineering Co. Ltd

Country: United Arab Emirates

12/2012 - 03/2014

Position: Commissioning Supervisor

Employer: Ruwais Refinery Expansion (SK Engineering & Constr

Country: United Arab Emirates

certificate