To contact this candidate email hr6@falconmsl.com
Endang Sulaiman Bin Rastam
- Electrician
- Profile Created Date:29 Mar 2020
Description
EXPERIENCE YEARS ( OIL& GAS ) OFF SHORE AND ONSHORE
PT Barata Indonesia, Periode Feb – Jan
- Client : CALTEX PACIFIC INDONESIA, DURI
- Position : Electrician
- Job of history and responsibility, Central gathering stasion – , Normal power system, Switchgear / switchboard ( medium and low Voltage ) maintenance and throw- over scheme, transformers, panel board, transient surge suppressors motor controller bus duct and tap devices, fuse / circuit breakers, relay protection system
PT. Kwartadaya Dirganusa, Periode Feb - juni
- Client : CALTEX PACIFIC INDONESIA, DURI
- Position : Electrical Technician
- Job of history and responsibility, all area, building and field. UPS cabling, generator paralleling switchgear automatic / static transfer switches, Roll up generator tab box, lighting control system, emergency power of system, data acquisition system. The integrate system test is the final step in the verification proses, during this integrate should be incorporated to evaluate the true operation of the facility combined system
PT. WIJAYA ENGINDONUSA, periode juli – October
- Client : CALTEX PACIFIC INDONESIA, DURI
- Position : E & I ( PRECOMM )
- Job of history and responsibility,
*Hook-up Electrical of cabling and checking list merger reading
*Grounding and bonding, lighting power control switches system
* flushing hydraulic line tubing .piping and the blowning
*Hydro testing line tubing hydraulic psig- psig
*FAT whcp, hpu chemical injection, fusible loop, shutdown panel, lcp valve, sdv, esdv, bdv
PT. CITRA MEGA KARYA GEMILANGPeriodeNov – Januari
- Client : CALTEX PACIFIC INDONESIA, DURI
- Position : Electrician
- Job of history and responsibility,
*Repair equipment, dump truck, excavator, loader,
*Trouble Shooting E & I Equipment motor – dynamo
* Install dismantle Unit Process
PT. FOXBORO PERKIND INDONESIAPeriode April - Des
- Client : Pertamina Up II Dumai
- Project : Re instrumentation E & I Cables
- Job of history and responsibility,
*dismantle – Install Cables Control In the panels control
*cable Power mcm
*Connection Cable pair to panel system
*Pre commissioning unit panel control
PT. DALLE ENERGY BATAM Periode July – Sept
- Client : PLTG BARELANG, BATAM
- Position : E & I ( Foreman )
- Job of history and responsibility, all area
*Electrical Cabling, hook up cable trey
*generator Cabling
*Switchgear / transformer
*UPS system
*grounding / bonding
*Lighting and lighting control
* Electrical metering
*switchgear / switchboard
*Integrated system, building automation
*direct Control
PT. SARIPARI PERTIWI INDONESIAPeriode Des – Oct
- Client : Caltex pasifik Indonesia, Duri
- Project : Drilling and work over services
- Position : Electrical technician
- Job of history and responsibility
*install dismantle Installation Building
*Trouble shooting lighting rig
*Repair Equipment unit
*setting switchboard Volt
PT. TUMINDA GRAHAPeriode Sept – Feb
- Client : Caltex pasifik Indonesia, Duri
- Project : Contract Electric submersible pump system installation and mantenence production facility
- Position : assistant specialist
- Job of history and responsibility
*install dismantle reda pump
*trouble shooting switchboard
*check underground Cable
*setting parameter ac
*Install pressure switch
*repair pump SPS
PT. TIMAS SUPLIINDOPeriodeJuli – Sep
- Client : Primer Oil Indonesia
- Project : Agx Compretion Reconfiguration johar, Natuna Indonesia
- Position : electrician
- Job of history and responsibility
*Electric on board DBL norceondefour mobilisasi Johar to Natuna
*Repair Installation Building, Panel control,
*install dismantle junction box distribution Volt
PT. ARDIAN PRATAMA PERKASAPeriode Aug – Nov
- Client : CHEVRON PASIFIK INDONESIA, DURI
- Project : Install dismantle ground Anchor Rig
- Job of history and responsibility, all Area SLN, HO
*check power in coming Volt from Switchboard to pumping unit
*install ground Anchor
PT. MARINE INDUSTRI ELECTRICAL INDONESIA PERIODE Jan – Juni
- Client : CHEVRON
- Position : E & I ( PRECOM )
- Job of history and responsibility,
*Trouble Shooting, electrical Cabling, panel distribution power
*Pre-Functional Checklist, Generator field
*Switchgear / transformer and building distribution board
VADHANA INTERNATIONAL period Juli – Maret
- Client : CHEVRON pacific Indonesia
- Project : Electrical Maintenance Services & Project Support
- Position : electrical Instrument Technician
- Job of history and responsibility
*repair LightingYard facility
*Repair motor pump equipment unit
*Trouble Shooting panel Control E &I Volt - Volt
* Install Dismantle motor
*Electrical CablingHook up Cable Try
* Generator powerSwitchgear & transformers
* UPS System and multiline system
*Grounding And Bounding
PT. M & I ELECTRIK INDONESIA Periode April – Aug
- Client : CHEVRON PASIFIK INDONESIA
- Position : electrical Foreman
- Job of history and responsibility, switchgear / switchboard
( Medium and low-Voltage ) maintenance and throw-over scheme, transformers, panel board, lighting and Lighting, control motor controller bus duct and tap devices, fuse/circuit breaker, relay protection system
PT. MEGASINERGY POWERINDOPeriode Sept
- Client : SAIPEM,TanjungBalaiKrimun
- Project : Module
- Position : electrical technician
- Job of history and responsibility, all area, building and field. UPS Cabling, Generator paralleling switchgear automatic / static transfer switches, roll up generator tab box, lighting control system. Motor controller bus duct and tap devices , UPS system
PT Bina Cipta persada periode oktobers up to November
Client : PLN Duri kec. Mandau kab.bengkalis
Project : Under ground cable X cm
Position : Electrical forman
Job,history,and responsibility Duri Sudirman up to hangtuah street.
PT. EL NUSA periode Maret s/d Mei
Client : British Petrolium Company
Project : LNG TANGGUH PAPUA
Position : forman
Job,history,and responsibility Project Shutdown LNG Tangguh Train
Nationality : Indonesia
Residential country : indonesia
Date of birth : 01-01-1970
Address :
Language: English
Language Known
Skills
COURSE OF ATTENDED:
Certificate Incident and injury free training of chevron Centre Duri
Certificate of Skill Development Surabaya.
PTW TRAINNING OF Chevron Duri.
LOTO TRAINNING OF Chevron Duri.
Icu E-COLOUR & AWARENESS Training of Chevron.
RISK ASSESSMENT AND JSA Training of Chevron.
HV Power Distribution System V- V Training Centre Chevron.
Education
Career
-
02/1999 - 01/2000
Position: Electrician
Employer: PT BARATA
Country: Indonesia
-
02/2000 - 06/2000
Position: Electrical Technician
Employer: PT. KWARTADAYA DIRGANUSA
Country: Indonesia
-
07/2000 - 10/2000
Position: E & I
Employer: PT. WIJAYA ENGINDONUSA
Country: Indonesia
-
11/2000 - 01/2001
Position: Electrician
Employer: PT. CITRA MEGA KARYA GEMILANG
Country: Indonesia
-
07/2004 - 09/2005
Position: E & I
Employer: PT. DALLE ENERGY BATAM
Country: Indonesia
-
12/2005 - 10/2006
Position: Electrical technician
Employer: PT. SARIPARI PERTIWI
Country: Indonesia
-
09/2007 - 02/2010
Position: assistant specialist
Employer: PT. TUMINDA GRAHA
Country: Indonesia
-
07/2012 - 09/2012
Position: electrician
Employer: PT. TIMAS SUPLIINDO
Country: Indonesia
-
01/2014 - 06/2016
Position: E & I
Employer: PT. MARINE INDUSTRI ELECTRICAL
Country: Indonesia
-
03/2015 - 07/2015
Position: electrical Instrument Technician
Employer: VADHANA INTERNATIONAL
Country: Indonesia
-
04/2016 - 08/2016
Position: electrical Foreman
Employer: PT. M & I ELECTRIK
Country: Indonesia
-
05/2017 - /
Position: forman
Employer: Reputed Company
Country: Indonesia