Photo

  Endang Sulaiman Bin Rastam

  Current Location: Indonesia

  •  Electrician
  • Profile Created Date:29 Mar 2020

Description

EXPERIENCE YEARS ( OIL& GAS ) OFF SHORE  AND ONSHORE

 

PT Barata  Indonesia, Periode  Feb – Jan

 

  • Client                                    : CALTEX PACIFIC INDONESIA, DURI

 

  • Position                                : Electrician

 

  • Job of history and responsibility, Central gathering stasion – , Normal power system, Switchgear / switchboard ( medium and low Voltage ) maintenance  and throw- over scheme, transformers, panel board, transient surge suppressors motor controller bus duct and tap devices, fuse / circuit breakers, relay protection system

 

PT. Kwartadaya Dirganusa, Periode Feb - juni

 

  • Client                                    : CALTEX PACIFIC INDONESIA, DURI

 

  • Position                                : Electrical Technician 

 

  • Job of history and responsibility, all area, building and field. UPS cabling, generator paralleling switchgear automatic / static transfer switches, Roll up generator tab box, lighting control system, emergency power of system, data acquisition system. The integrate system test is the final step in the verification proses, during this integrate should be incorporated  to evaluate the true operation of the facility combined system

 

PT. WIJAYA ENGINDONUSA, periode juli – October 

 

  • Client                                    : CALTEX PACIFIC INDONESIA, DURI

 

  • Position                                : E & I ( PRECOMM )

 

  • Job of history and responsibility,

 

*Hook-up Electrical of cabling and checking list merger reading

*Grounding and bonding, lighting power control switches system

* flushing hydraulic line tubing .piping and the blowning

*Hydro testing line tubing hydraulic psig- psig

*FAT whcp, hpu chemical injection, fusible loop, shutdown panel, lcp valve, sdv, esdv, bdv

 

PT. CITRA MEGA KARYA GEMILANGPeriodeNov – Januari

 

  • Client                                    : CALTEX PACIFIC INDONESIA, DURI

 

  • Position                                : Electrician

 

  • Job of history and responsibility,

*Repair equipment, dump truck, excavator, loader,

*Trouble Shooting E & I Equipment motor – dynamo

* Install dismantle Unit Process

 

PT. FOXBORO PERKIND INDONESIAPeriode April - Des

  • Client                                    : Pertamina Up II Dumai

 

  • Project                                 : Re instrumentation E & I Cables

 

  • Job of history and responsibility,

 

*dismantle – Install Cables Control In the panels control

*cable Power mcm

*Connection Cable pair to panel system

*Pre commissioning unit panel control

 

PT. DALLE ENERGY BATAM Periode July –  Sept

 

  • Client                                    : PLTG BARELANG, BATAM

 

  • Position                                : E & I ( Foreman )

 

  • Job of history and responsibility, all area

*Electrical Cabling, hook up cable trey

*generator Cabling

*Switchgear / transformer

*UPS system

*grounding / bonding

*Lighting and lighting control

* Electrical metering

*switchgear / switchboard

*Integrated system, building automation

*direct Control

 

 

PT. SARIPARI PERTIWI INDONESIAPeriode Des – Oct

 

  • Client                                    : Caltex pasifik Indonesia, Duri

 

  • Project                                 : Drilling and work over  services

 

  • Position                                : Electrical technician

 

  • Job of history and responsibility

*install dismantle Installation Building

*Trouble shooting lighting rig

*Repair Equipment unit

*setting switchboard Volt

 

PT. TUMINDA GRAHAPeriode  Sept – Feb

 

  • Client                                    : Caltex pasifik Indonesia, Duri

 

  • Project                                 : Contract Electric submersible pump system installation and mantenence production facility

 

  • Position                                : assistant specialist

 

  • Job of history and responsibility

*install dismantle reda pump

*trouble shooting switchboard

*check underground Cable

*setting parameter ac

*Install pressure switch

*repair pump SPS

 

PT. TIMAS SUPLIINDOPeriodeJuli – Sep

 

  • Client                                    : Primer Oil Indonesia

 

  • Project                                 : Agx Compretion Reconfiguration johar, Natuna Indonesia

 

  • Position                                : electrician

 

  • Job of history and responsibility

*Electric on board DBL norceondefour mobilisasi Johar to Natuna

*Repair Installation Building, Panel control,

*install dismantle junction box distribution Volt

 

PT. ARDIAN PRATAMA PERKASAPeriode Aug – Nov

  • Client                                    : CHEVRON PASIFIK INDONESIA, DURI

 

  • Project                                 : Install dismantle ground Anchor Rig

 

  • Job of history and responsibility, all Area SLN, HO

 

*check power in coming Volt from Switchboard to pumping unit

*install ground Anchor

 

 

PT. MARINE INDUSTRI ELECTRICAL INDONESIA PERIODE Jan – Juni

  • Client                                    : CHEVRON

 

  • Position                                : E & I ( PRECOM )

 

  • Job of history and responsibility,

 

*Trouble Shooting, electrical Cabling, panel distribution power

*Pre-Functional Checklist, Generator field

*Switchgear / transformer and building distribution board

 

 

VADHANA INTERNATIONAL period Juli – Maret

 

  • Client                                    : CHEVRON pacific Indonesia

 

  • Project                                 : Electrical Maintenance Services & Project Support

 

  • Position                                : electrical Instrument Technician

 

  • Job of history and responsibility

 

*repair LightingYard facility

*Repair motor pump equipment unit

*Trouble Shooting panel Control E &I Volt - Volt

* Install Dismantle motor

*Electrical CablingHook up Cable Try

* Generator powerSwitchgear & transformers

* UPS System and multiline system

*Grounding And Bounding

 

 

PT. M & I ELECTRIK INDONESIA Periode April – Aug

 

  • Client                                    : CHEVRON PASIFIK INDONESIA

 

  • Position                                : electrical Foreman

 

  • Job of history and responsibility, switchgear / switchboard

 

( Medium and low-Voltage ) maintenance and throw-over scheme, transformers, panel board, lighting and Lighting, control motor controller bus duct and tap devices, fuse/circuit breaker, relay protection system

 

PT. MEGASINERGY POWERINDOPeriode Sept

 

 

  • Client                         : SAIPEM,TanjungBalaiKrimun
  • Project                                 : Module
  • Position                                : electrical technician
  • Job of history and responsibility, all area, building and field. UPS Cabling, Generator paralleling switchgear automatic / static transfer switches, roll up generator tab box, lighting control system. Motor controller bus duct  and tap devices , UPS system

 

PT Bina Cipta persada periode oktobers up to November

 

 Client                                : PLN Duri kec. Mandau kab.bengkalis

 Project                             : Under ground cable X cm

Position                           : Electrical forman

 

Job,history,and responsibility Duri Sudirman up to hangtuah street.

 

 

PT. EL NUSA periode Maret s/d Mei

 

 Client                                : British Petrolium Company

Project                             : LNG TANGGUH PAPUA

Position                           : forman

 

Job,history,and responsibility Project Shutdown LNG Tangguh Train

 

Nationality : Indonesia


Residential country : indonesia


Date of birth : 01-01-1970

Address :


Language: English


Language Known

Skills

    COURSE OF ATTENDED:

     

    Certificate Incident and injury free training of chevron Centre Duri

    Certificate of Skill Development Surabaya.

    PTW TRAINNING OF Chevron Duri.

    LOTO TRAINNING OF Chevron Duri.

    Icu E-COLOUR & AWARENESS Training of Chevron.

    RISK ASSESSMENT AND JSA Training of Chevron.

    HV Power Distribution System V- V Training Centre Chevron.

Education

Career

02/1999 - 01/2000

Position: Electrician

Employer: PT BARATA

Country: Indonesia

02/2000 - 06/2000

Position: Electrical Technician

Employer: PT. KWARTADAYA DIRGANUSA

Country: Indonesia

07/2000 - 10/2000

Position: E & I

Employer: PT. WIJAYA ENGINDONUSA

Country: Indonesia

11/2000 - 01/2001

Position: Electrician

Employer: PT. CITRA MEGA KARYA GEMILANG

Country: Indonesia

07/2004 - 09/2005

Position: E & I

Employer: PT. DALLE ENERGY BATAM

Country: Indonesia

12/2005 - 10/2006

Position: Electrical technician

Employer: PT. SARIPARI PERTIWI

Country: Indonesia

09/2007 - 02/2010

Position: assistant specialist

Employer: PT. TUMINDA GRAHA

Country: Indonesia

07/2012 - 09/2012

Position: electrician

Employer: PT. TIMAS SUPLIINDO

Country: Indonesia

01/2014 - 06/2016

Position: E & I

Employer: PT. MARINE INDUSTRI ELECTRICAL

Country: Indonesia

03/2015 - 07/2015

Position: electrical Instrument Technician

Employer: VADHANA INTERNATIONAL

Country: Indonesia

04/2016 - 08/2016

Position: electrical Foreman

Employer: PT. M & I ELECTRIK

Country: Indonesia

05/2017 - /

Position: forman

Employer: Reputed Company

Country: Indonesia

certificate